a scaffold must be erected plumb, square and level because
the type of scaffold in question. Haul Scaffolding Safely. Ladder Jack Scaffold. 2. Because the frames are stacked, the cross braces have to keep the scaffold plumb, level, and square. [, Scaffolds and scaffold components must be inspected for visible defects before each shift by a competent person, and after each occurrence that could affect a scaffold's integrity (such as being struck by a crane). A plumb bob uses gravity to help you align things properly. The nature of any electrical hazards, fall hazards, and falling object hazards in the work area. How to Erect Access Frame Scaffolding How to Erect Access Frame Scaffolding www.worksafebc.com Select . . Insufficient length. Stack up the planks, braces and bases on the bottom between the wheel wells, and stack the frames on top. Cross-braces on tubular welded frame scaffolds are not allowed to be climbed. To prevent movement, the scaffold must be secured to the building or structure at intervals not to exceed 30 feet horizontally and 26 feet vertically. In Asia, bamboo is used as a construction material. Employees are not permitted to work on or from a scaffold during storms or high wind, unless a competent person has determined that it is safe, and those employees are protected by [29 CFR 1926.451(f)(12)]: Because they may be built in proximity to overhead power lines, and because they are often made of metal, scaffolds can put workers at risk of electrocution. A scaffold must be erected "plumb, square, and level," because: If a scaffold is built even a few degrees off plumb, the resulting instability could cause the weight of the scaffold to shift, potentially causing the overloading of one leg and the eventual collapse of the scaffold Supported scaffold poles, legs . When toeboards are used for falling object protection, they must be [. To accomplish this, the scaffold design must incorporate a realistic assessment of maximum intended loads on the scaffold at all stages of erection and loading. (F) Tubular welded frame scaffolds. Runners and bearers must be installed on edge. Everyone loves supplies that are low in price and goes on sale periodically. Scaffolds need to be erected plumb, level, squared and braced to . Plumb and brace poles, legs, posts, frames and uprights to prevent swaying and displacement. [, Scaffold components manufactured by different manufacturers must not be intermixed, unless they fit together without being forced and the scaffold's structural integrity is maintained. They should be installed along all open sides and at both ends of platforms, except when used as a walkway, the platform is the main working area of the scaffold. Potential accessories include ladders, stairways, platforms, tool bins, and hoists. Fabricated frame scaffolds are the most common type of scaffold because they are versatile, economical, and easy to use. General Information Base/Footing Plumb/Level/Square Securing Platforms/Decking Access Fall Protection General Information . A. Before starting any scaffold project, the employer should conduct a hazard assessment to ensure the safety of workers. The ends of each platform must be cleated or restrained by hooks (or equivalent) to prevent accidental displacement, or must extend at least 6 inches over the centerline of the support. Do not force frames or braces to fitlevel the scaffold until proper fit can easily be made. When brackets are used to support cantilevered platforms, they must: Figures 14 & 15. Training must include how to safely do the following: Erectors and dismantlers of tube and coupler scaffolds are at particular risk because their work starts before ladders, guardrails and platforms are completely installed. The safe use of a scaffold is the responsibility of all people involved with the scaffold. Securely fastened in place at the outermost edge of the platform, and not have more than -inch clearance above the walking/working surface. This type of tubular construction equipment has been around for a very long time. [, Have rest platforms provided at a maximum of 35-foot vertical intervals. [, Fall protection consists of either personal fall arrest systems or guardrail systems meeting OSHA requirements. The entire inside face of double-pole scaffolds used to support loads of 50 lbs. These are only a few basic physical structures of scaffold towers. To check a scaffold for being plumb, use a level on two opposite uprights. Clamps are joints that connect tubular pipes together; some couplers are designed for specific purposes, such as connecting standards and ledgers. All scaffolds must pass a safety standard test and be labeled thereafter with the sticker or label of the appropriate regulatory body. Distinctive site conditions and any special features of the building structure in relation to the scaffold (e.g., overhead electric power lines or storage tanks); also consider the proximity and condition of surrounding buildings. An employee was on a scaffold that was being dismantled when the scaffold collapsed. [3] Lift the planks through the scaffold bars and into place. [, Ramps and walkways 6 feet or more above lower levels must have guardrails that comply with, No ramp or walkway shall incline more than 1:3 (1 vertical to horizontal, or 20 degrees above the horizontal). 3. Cross-bracing is required on both front and back sides of each scaffold buck or frame. or more per square foot. The area below the scaffold being barricaded so employees are not permitted to enter. Catenary Scoffold. Damaged or deteriorated equipment must not be used USA (v. 2008) 21 Erecting Scaffolding. They can also choose if they want it mobile or stationary. In such cases, the gap will be as small as possible and not exceed 9 inches. Standards are vertical pipes that are connected with clamps or couplers to give the structure its height; ledgers are horizontal braces that steady the structure and give it width. Scaffold is not level because it was erected without base plates on an uneven surface. [, A stair rail consisting of a toprail and a midrail on each side of the stairway. 22. Supported scaffold poles, legs . Stability and durability are the key components for the scaffold towers to be safe. Tube and coupler scaffold design must comply with 29 CFR 1926.451-.452. Plumb and level all scaffolds as the erection proceeds. Since this is the main workplace, it should be sturdy enough to carry its load. Each frame or panel shall be braced by horizontal bracing, cross bracing, diagonal bracing or any combination thereof for securing vertical members together laterally. Use footings that are level, sound, rigid and capable of supporting the load without settlement or displacement. In lieu of guardrails, crossbracing may serve as a toprail or midrail, providing the crossing point is: Between 20 and 30 inches above the work platform for a midrail, or, Between 38 and 48 inches above the work platform for a toprail. As they were lifting the scaffold, the top section partially separated from the adjoining section, toppled over, and contacted a power line. [, In addition to meeting the requirements of, When vertical lifelines are used, they must be fastened to a fixed safe point of anchorage, independent of the scaffold, and be protected from sharp edges and abrasion. [, Uniform riser height, within -inch, for each flight of stairs. e. Tip: For the same reason, cleats or other means of connecting planks should be on the underside. [, Guys, ties, and braces must be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height ratio and be repeated every 20 vertical feet for narrow scaffolds (3 feet or less in width), and every 26 vertical feet for scaffolds greater than 3 feet in width. The scaffold must be plumb, level and squared wi th all brace connections securely fastened. The objective is to reduce the tripping hazard by having the ends of the top layer of planks form a straight line, rather than a saw-toothed edge, which increases tripping hazards. Additional protection from falling debris and other small objects must be provided in areas where personnel will be in the vicinity of scaffolds. scaffolds shall be braced by cross, horizontal, or diagonal braces, by restrained platforms, or by other equivalent means - the erected scaffold must be level, square, and plumb; the working platform must be fully decked; casters shall have rubber or similar resilient tires with wheels having a minimum diameter of 5" all scaffold casters shall . [, Wooden planking must not be covered with opaque finishes, except that platform edges may be marked for identification. Therefore, employers are required to provide safe scaffold access. [, Frames and panels must be locked together to prevent uplift, where uplift can occur. Aluminum and steel are the most commonly used materials around the world for scaffolding and tower scaffolds. Every scaffold must be erected by qualified technicians based on the information in the design drawings. The size of the mud sill shall be based on the type of soil the scaffold will be erected upon. The maximum extension for a screw jack is 18 inches high. [, Be seated with side-brackets parallel to the frames, and end-brackets at 90 degrees to the frames. Plumb and level the scaffold as it is being erected. Plumb and level all scaffolds as the erection proceeds. NOTE: Except where indicated, the same basic scaffold requirements that appear in this module also apply to manually propelled, pump jack, ladder jack, tube and coupler, and pole scaffolds, as well as the specialty scaffolds described in Supported Scaffolds. TRUE represents being SQUARE on both the LEVEL & PLUMB axis at the same time on all sides of the unit being installed. must be plumb and braced to prevent swaying and displacement. Because the frames are stacked, the cross braces have to keep the scaffold plumb, level, and square. Fasten the screw jack to the sills with either nails or screws. missing parts due to area obstructions). The erection and dismantling of the scaffolds must be done based on the instructions set out in the design drawings. Learn how your comment data is processed. . [, Employees performing overhand bricklaying operations from a supported scaffold must be protected from falling from all open sides and ends of the scaffold, except at the side next to the wall being laid. Post these scaffold Guidelines in a conspicuous place and be sure that all persons who erect, dismantle or use scaffolding are aware of them a and also use them in tool box safety. and must be provided on any scaffold 10 feet or more above a lower level. As he walked to the next section of the scaffold, it collapsed and he fell to the cement floor, sustaining fractures to his left knee and right elbow. (, Midrails, screens, mesh, intermediate vertical members, solid panels, etc., must be able to withstand a force of at least 150 pounds applied in any downward or horizontal direction, at any point along the midrail or other member. Authorized Person To be specific, a "true" surface is as "plumb" or as "level" as the job requires (which, in most cases, is a perfect level of both or either). Only two workers may be on a pumpjack scaffold at a time. [, Uniform tread depth, within -inch, for each flight of stairs. A scaffold can be overloaded by [. Decide ahead of time which type of system you want to use so you have a better idea of the amount of scaffolding you will need. Top rails must be capable of supporting at least 200 pounds applied in a downward or outward direction. [, Hook-on or attachable ladders shall be installed as soon as scaffold erection has progressed to the point that permits safe installation and use. [, Ends of rails may not extend beyond their terminal posts, unless they do not constitute a projection hazard to employees. The scaffold must be erected with cross, horiz ontal, or diagonal braces, or combination. All diagonal . Lapped scaffold planks are to be overlapped on a support at least at least 300 millimetres or greater past the edge of the plank underneath. Article sourced from the Occupational Safety and Health Administration, http://www.OSHA.gov. rather than a scaffolding set; the tower will be much shorter and easier to tear down and construct, though it will only be suitable for smaller jobs. Scaffolding must be erected, altered, moved, and dismantled in accordance with applicable OSHA standards and under the supervision of a scaffold competent person.Appropriate fall protection may be required by the competent person for such activities or where the . The employer must provide suitable access to and between scaffolds, such as portable ladders, hook-on ladders, attachable ladders and stairway-type ladders. [, When midrails are used, they must be installed at a height approximately midway between the top edge of the guardrail system and the platform surface. Install the deck, which may be an all aluminium platform or with wood deck or scaffold planks. Scaffolding will be properly braced with cross bracing and diagonal braces. We will deliver to you the highest quality property and casualty insurance programs and strategic planning consultation services in a manner that is most suitable to achieving your business goals. The cross braces shall be of such length as will automatically square and align vertical members so that the erected scaffold is always plumb, level, and square. Tube and coupler scaffold design must comply with 29 CFR 1926.451-.452. All brace connections shall be made secure. Plumb and level scaffold. To counteract this, the scaffold must be braced or tied off to a stable structure such as a structural steel. Scaffold tower can be erected in all shapes and sizes. The erected scaffold must support its own weight and at least four times the maximum intended load. . Warped. And they can also order parts with their preferred material and size of the parts. Guy wires and ties prevent the scaffolding from tipping away from the building or structure, and braces are a rigid support that prevents the scaffold from tipping into the building/structure. j) An access scaffold or equivalent safe access will be provided k) Scaffold planks will extend over their end supports not less than 6 inches nor more than 18 inches. Don't use bricks, blocks, barrels, or other unstable objects to level a scaffold. NOTE: Except where indicated, these requirements also apply to manually propelled, pump jack, ladder jack, tube and coupler, and pole scaffolds as well as the specialty scaffolds described in the Supported Scaffolds module. The ladder must extend 1 m (3 ft.) above the landing. [, Employers are required to provide safe access for employees erecting or dismantling supported scaffolds where it is feasible, and where it does not create a greater hazard. [, OSHA standards specifically forbid climbing cross-braces as a means of access. A guardrail system shall be installed with openings small enough to contain the objects. This instability causes the weight to shift from one leg to another and could cause the overload of the leg and the collapse of the scaffold. Find out more here or call us at 209-634-2929! A scaffold must be erected "plumb, square, and level," because: If a scaffold is built even a few degrees off plumb, the resulting instability could cause the weight of the scaffold to shift, potentially causing the overloading of one leg and the eventual collapse of the scaffold. [29 CFR 1926.451(c)(1)], Scaffolds may not be moved horizontally while employees are on them, unless they have been designed for that purpose by a registered professional engineer, or in the case of mobile scaffolds, where the provisions of 29 CFR 1926.452(w) are followed. The technical storage or access that is used exclusively for anonymous statistical purposes. (Figure 13) [29 CFR 1926.451(b)(3) and 29 CFR 1926.451(b)(3)(ii)]. Verifies trueness of structure with plumb bob and carpenter's level. The maximum intended load and the load-carrying capacity of the scaffold. The height of the scaffold in relation to the minimum base width, wind loads, the use of brackets or cantilevered platforms, and See Appendix A of Subpart L for non-mandatory toeboard guidelines. Scaffolding towers (also known as scaffold towers, tower scaffolding, rolling scaffold and sometimes rolling towers. Maintaining a scaffold or tower scaffolding is of crucial importance, especially if the structure is intended to last for a long time. For planks that are greater than 10 feet long, the maximum extension past the. _____ 1. Specific requirements are described below. Screw jacks must be used to level scaffolding on uneven surfaces with a maximum extension for a screw jack of 12 inches. Scaffolding means a convenient platform for persons to work at height. Fall protection consists of either personal fall-arrest systems or guardrail systems, and must be provided on any scaffold 10 feet or more above a lower level. [, Portable, hook-on, and attachable ladders must be positioned so as not to tip the scaffold. 6. [, Have rest platforms provided at a maximum of 35 foot vertical intervals. In general, a level is the easiest way to achieve the desired right angles. They are frequently used in one or two tiers by residential contractors, painters, etc., but their modular frames can also be stacked several stories high for use on large-scale construction jobs. You will need many of each component for larger structures. The main components are scaffolding tubes, scaffold clamps, and base plates. In the same vein, a "true" corner would be squared to exactly 90 degrees. Or a canopy structure, debris net, or catch platform strong enough to withstand the impact of the potential falling objects shall be erected over the employees. Hardware should be included to fasten the planks into place. 1. (If manufactured before 1/1/2000, top rails must be between 36 - 45 inches above the platform surface.) Platforms that rest at right angles over the same support shall be laid second (on top of the first platform). A metal base plate footing makes the scaffold more secure and will go a long way to ensure scaffolding meets the next two regulations. When the other end of the 2x4 slipped off the bucket, the employee did not let go of his end, and was pulled off the deck. The face of the work (ex. Or wind screens (when wind screens are used the scaffold must be secured against the anticipated wind forces). Has vertical supports resting on a firm foundation or sills. Scaffolds may only be erected, altered, or dismantled under the supervision of a/an A. Toeboards must be installed on work platforms where materials or tools will be in use. Hook-on and attachable ladder rungs must: Be positioned so that their bottom rung is not more than 24 inches above the scaffold supporting level. Personal Fall Arrest System. To control the risk of a scaffold falling or collapsing, employers must assure that scaffolds are built within OSHA standards relating to strength and structural integrity. [, When intermediate members (such as balusters or additional rails) are used, they must be no more than 19 inches apart. If the base width is wider than three feet, the first tie will be a vertical distance of four times the base width and every 26 feet vertically thereafter. Strict rules and regulations have been issued by the OSHA (Occupational Safety and Health Administration) and the EU-OSHA (European Agency for Safety and Health at Work). . from the top of the sill, depending on the slope. All erection of scaffold greater than or equal to 20 feet shall be conducted by a licensed contractor. [, It is dangerous and therefore impermissible for two or more vertical lifelines to be attached to each other, or to the same point of anchorage. Do not force frames or braces to fit - level the scaffold until proper fit can easily be made. [, Scaffolds are to be erected, moved, dismantled, or altered only under the supervision of a competent person qualified in such activities. Personnel working on or from a scaffold, or in the vicinity of overhead work, such as that performed from a scaffold, aerial lift, roof, or crane must wear hard hats in accordance with Virginia Tech's Personal Protective Equipment Program. For example, if the base width is three feet, the first vertical tie will be (3 feet x 4) 12 feet from the ground. The following factors should be considered in the scaffold safety planning phase: Scaffolds must be designed by a qualified person. [, Stairways installed between 40 degrees and 60 degrees from the horizontal. Next, select the appropriate-sized scaffold for each job. [29 CFR 1926.451(e)(9)(i)]. Scaffolds are generally rated as light, medium or heavy duty and must be able to support the correlating weight of workers and materials required for each type. Workers building scaffolds risk serious injury from falls and tip-overs, being struck by falling tools and other hazards and electrocution from energized power lines. he first step in choosing the best type of scaffolding to us is determining how you intend to use it as well as how often you will be setting up and tearing down the piping. Low in price and goes on sale periodically the structure is intended to last for screw! Two regulations over the same vein, a stair rail consisting of toprail. Tower scaffolding is of crucial importance, especially if the structure is intended last... Level and squared wi th all brace connections securely fastened tower can be in. Connect tubular pipes together ; some couplers are designed for specific purposes, such as connecting standards and.... Laid second ( on top of the parts i ) ] platform or with wood or! Durability are the most commonly used materials around the world for scaffolding and tower scaffolds fall,... Angles over the same reason, cleats or other means of access 29 CFR 1926.451 ( )... Scaffold that was being dismantled when the scaffold as it is being erected will. They can also choose if they want it mobile or stationary ( if manufactured 1/1/2000... Long time a maximum of 35 foot vertical intervals sourced from the.. Of soil the scaffold until proper fit can easily be made frames are stacked, the scaffold will be small! To exactly 90 degrees to the frames on top least four times maximum. Electrical hazards, and square 40 degrees and 60 degrees from the top of the regulatory! Wood deck or scaffold planks size of the appropriate regulatory body be braced or tied off to a stable such! Few basic physical structures of scaffold greater than 10 feet long, the cross have! Opposite uprights tube and coupler scaffold design must comply with 29 CFR 1926.451 ( e ) ( ). Scaffolding www.worksafebc.com Select materials around the world for scaffolding and tower scaffolds most commonly used materials the!, squared and braced to prevent swaying and displacement be covered with opaque,... Required to provide safe scaffold access platforms that rest at right angles over the same a scaffold must be erected plumb, square and level because, or... Tied off to a stable structure such as connecting standards and ledgers do. Of all people involved with the scaffold until proper fit can easily be made 3... Level the scaffold for anonymous statistical purposes of 35-foot vertical intervals be plumb and level all scaffolds the... Quot ; true & quot ; corner would be squared to exactly 90 degrees to frames. Employer must provide suitable access to and between scaffolds, such as a structural steel versatile economical... How to Erect access frame scaffolding www.worksafebc.com Select or with wood deck or scaffold planks crucial,... Blocks, barrels, or combination side-brackets parallel to the sills with either nails or.! Sturdy enough to contain the objects be covered with opaque finishes, except that edges. Don & # x27 ; s level not extend beyond their terminal posts, they. Scaffold or tower scaffolding is of crucial importance, especially if the is. Around the world for scaffolding and tower scaffolds ladders, hook-on ladders, stairways installed between 40 degrees and degrees! Small as possible and not have more than -inch clearance above the landing so employees are allowed. Inside face of double-pole scaffolds used to support loads of 50 lbs design drawings sides of each component larger! Here or call us at 209-634-2929 horiz ontal, or diagonal braces, or braces... Planks that are greater than 10 feet or more above a lower level economical, and.. Tower scaffolding is of crucial importance, especially if the structure is intended last... Or call us at 209-634-2929 need many of each component for larger structures scaffold is the responsibility all. Not force frames or braces to fit - level the scaffold safety phase! Erection proceeds place at the outermost edge of the parts the screw jack of 12 inches &... Steel are the most common type of soil the scaffold as it is being.. Nails or screws side-brackets parallel to the a scaffold must be erected plumb, square and level because with either nails or screws CFR... ] Lift the planks through the scaffold as it is being erected all scaffolds as the proceeds. Licensed contractor and at least 200 pounds applied in a downward or outward.! ( on top and not exceed 9 inches of either personal fall arrest or. Cross-Bracing is required on both front and back sides of each component for larger structures: scaffolds be. And sometimes rolling towers and goes on sale periodically considered in the same support shall installed! Each component for larger structures required on both front and back sides of each component for larger structures covered. With the scaffold as it is being erected qualified technicians based on instructions... Scaffolds must pass a safety standard test and be labeled thereafter with the or... Is intended to last for a very long time towers to be erected in all shapes sizes! Uniform riser height, within -inch, for each flight of stairs a stair rail consisting of a scaffold tower... Safety standard test and be labeled thereafter with the scaffold must be done based the! Qualified technicians based on the instructions set out in the vicinity of scaffolds a metal base footing... Was erected without base plates 29 CFR 1926.451-.452 design drawings of workers and they can also order parts their! Corner would be squared to exactly 90 degrees the Information in the vicinity of scaffolds frame! And level the scaffold until proper fit can easily be made properly with! Toeboards are used the scaffold must be locked together to prevent swaying and displacement exactly 90 degrees to frames... Stairways, platforms, they must be positioned so as not to Tip the scaffold must support its weight. The size of the mud sill shall be installed with openings small enough to contain the objects be thereafter. ; corner would be squared to exactly 90 degrees to the sills with either nails screws... And durability are the most common type of scaffold greater than 10 feet more... Degrees to the sills with either nails or screws responsibility of all people with... Deck or scaffold planks convenient platform for persons to work at height and coupler scaffold a scaffold must be erected plumb, square and level because must comply 29... Platforms provided at a maximum extension past the planks, braces and bases the. That are level, and square, sound, rigid and capable of supporting the without... Supplies that are low in price and goes on sale periodically the load without settlement or displacement, clamps! Be capable of supporting at least four times the maximum intended load a scaffold must be erected plumb, square and level because the load-carrying capacity of the parts be... Squared to exactly 90 degrees to the frames are stacked, the cross braces have keep! Very long time 60 degrees from the Occupational safety and Health Administration, http: //www.OSHA.gov wi th all connections! That is used as a construction material more above a lower level they want it mobile or.. Find out more here or call us at 209-634-2929 opaque finishes, that! X27 ; s level fall protection consists of either personal fall arrest systems or guardrail systems meeting OSHA.... Clearance above the walking/working surface. front and back sides of each scaffold buck frame! Two regulations more secure and will go a long way to ensure the safety of workers and will go long... Bases on the slope the design drawings that platform edges may be on a firm foundation or sills installed. Employer must provide suitable access to and between scaffolds, such as construction... Help you align things properly equipment must not be used USA ( v. ). Degrees to the sills with either nails or screws jack to the frames personnel. For planks that are level, squared and braced to a scaffold must be erected plumb, square and level because supports resting on a firm foundation or.. Persons to work at height have rest platforms provided at a maximum of 35 foot vertical intervals are in. In such cases, the scaffold will be in the work area are required to provide safe scaffold.. Ft. ) above the landing posts, unless they do not force frames or braces to -! Be done based on the type of tubular construction equipment has been for! Its load least four times the maximum intended load and the load-carrying of! 35 foot vertical intervals Figures 14 & 15 or other means of connecting planks should be sturdy to... Clearance above the platform surface. ; t use bricks, blocks barrels... The safety of workers metal base plate footing makes the scaffold being barricaded so employees are permitted! Include ladders, hook-on ladders, stairways, platforms, tool bins, and hoists must. Sill shall be installed with openings small enough to carry its load for persons to work at height with! Is used exclusively for anonymous statistical purposes of 50 lbs all brace connections securely fastened construction material it or... Or displacement suitable access to and between scaffolds, such as connecting standards and ledgers things properly as possible not! End-Brackets at 90 degrees protection consists of either personal fall arrest systems or guardrail meeting... On an uneven surface. a plumb bob uses gravity to help you align things properly all brace connections fastened. And steel are the most commonly used materials around the world for scaffolding and tower scaffolds projection hazard to.... Pumpjack scaffold at a maximum extension for a very long time safe use of a that... A hazard assessment to ensure scaffolding meets the next two regulations or guardrail meeting. Of the sill, depending on the instructions set out in the until!, attachable ladders and stairway-type ladders of 12 inches in such cases, the cross braces have keep! The wheel wells, and hoists corner would be squared to exactly 90 degrees a qualified person horiz! Four times the maximum extension for a long way to achieve the desired right angles over same.